
So it looks like we need to review the following controls:
Control 3 Control 6 Control 7 Control 16 Control 19
Do we need to assign out who is going to review each control? I can do Control 6 since I did that one with Weber.
Mark
On Thu, Jan 16, 2014 at 8:29 PM, Andrew Goble goble@dixie.edu wrote:
Our SANS questionnaire is up too...
I plan to build a wiki / samba box on the strike package for use this assessment and in the future. Now's the time to get any tools you need for the upcoming assessment ready. I think we have a clean snapshot of the backtrack boxes we can revert to / copy from.
Thanks, Andrew
On 01/13/2014 04:32 PM, Andrew Goble wrote:
The Dixie Statement of Work / Rules of Engagement document is up in my home directory on USHEdump. It has our IP space for scans listed there. I'm thinking we should plan for an external scan early next week and internal scanning the weekend of the 25th.
The SANS worksheet will be forthcoming in a day or two.
Thanks, Andrew _______________________________________________ USHE-assess mailing list USHE-assess@lists.dixie.edu http://lists.dixie.edu/cgi-bin/mailman/listinfo/ushe-assess
USHE-assess mailing list USHE-assess@lists.dixie.edu http://lists.dixie.edu/cgi-bin/mailman/listinfo/ushe-assess